Warning: mysqli_connect() [function.mysqli-connect]: (28000/1045): Access denied for user 'db448209'@'216.201.101.20' (using password: YES) in /u/x/xeneca/ht_prepend/ht_prepend.php on line 11

Warning: mysqli_query() expects parameter 1 to be mysqli, boolean given in /u/x/xeneca/ht_prepend/ht_prepend.php on line 15

Warning: mysqli_fetch_assoc() expects parameter 1 to be mysqli_result, null given in /u/x/xeneca/ht_prepend/ht_prepend.php on line 17

Warning: mysqli_close() expects parameter 1 to be mysqli, boolean given in /u/x/xeneca/ht_prepend/ht_prepend.php on line 77
Kapuskasing River: Middle Twp. Buchan, Lapinigam Rapids, Near North Boundary, Outlet Kapuskasing Lake

Kapuskasing River:Middle Twp. Buchan (Clouston Rapids), Lapinigam Rapids (Buchan Falls), Near North Boundary (Cedar Rapids)

Xeneca has three proposed waterpower project located on the Kapuskasing River near the Town of Kapuskasing. These waterpower projects will generate renewable energy at a total installed capacity of about 18.75 MW.

  • Click here
  • Click here
  • Click here
  • Click here