Marter Final Environmental Report
Thank you to all stakeholders who have participated in the Environmental Assessment process for the Marter Twp. project on the Blanche River.
The public review period for the Marter Twp. Environmental Report ("ER") is now closed. The review period ran for 33 calendar days, from February 10, 2014 until 11:59 p.m. on March 14, 2014.
For more information, please see this cover letter.
List of Annexes & Appendices
- Annex I - Operating Plan, Hydraulic Modeling, Hydrology, Mapping, Bathymetry & Erosion Studies
Part I, Part II, Part III, Part IV - Annex II - Construction Management Plan, Conceptual Engineering Plans, Preliminary Erosion & Sediment Control Plan, Initial Environmental Sound Study
- Annex III - Natural Heritage Assessments (Environmental Characteristics Reports, Mitigation and Recommendations Summary Report, Wetlands Rapid Assessment - Roads & Power Lines)
Part I, Part II, Part III - Annex IV - Water Quality Studies (Surface Water Quality Monitoring Program, Surface Water Quality and Fish Sampling Guidance, Pre-Development Water Quality and Fish Tissue Mercury, Screening Assessment – Water Temperature)
Part I, Part II, Part III - Annex V - Archaeological Assessment
- Annex VI - Access Roads & Connection Line Summary
- Appendix A - Waterway Design, MNR Site Information Package & Zone of Influence Rationale
- Appendix B - Project Description
- Appendix C - Agency Consultation
Part I, Part II, Part III - Appendix D - Public Consultation
Part I, Part II - Appendix E - Aboriginal Consultation & Engagement