Frederick House River Wanatango Falls GS
Frederick House River - Wanatango Falls GS Environmental Assessment Report
- A Letter to all Stakeholders
- Environmental Report
- Notice of Completion
- Annex I: Hydrology Studies & Proposed Operating Plan
Annex IA: Hydrology Review
Annex IB: HEC - RAS Report
Annex IC: Proposed Operating Flows & Levels
Annex ID: Erosion Potential Analysis
Annex IE: Hydrology Ananlysis - Annex II: Conceptual Design
Annex IIA: Conceptual Layout Drawings
Annex IIB: Connection Line Summary
Annex IIC: Construction Management Plan - Annex III: Natural Environmental Characterization & Impact Assessment Report
- Annex IV: 2010 Surface Water Quality Letter Report
- Annex V: Stage 1 Summary Archeological Assessment Report
- Appendix A: Waterway Designation & MNR Site Description Package
- Appendix B: Potential Effects Identification Matrix for Construction & Operation
- Appendix C: Agency Consultation
- Appendix D: Public Consultation*
- Appendix E: Aboriginal Consultation & Engagement*
*Xeneca must respect the confidentiality of stakeholders. Xeneca is committed to fulfilling its consultation obligation. If you are looking for a specific document, we will take your request under consideration. We need to review any outgoing correspondence for confidentiality before it is released to the public.
Please Note - The ER will be available on our website for a 30 calendar day review period from Thursday October 6, 2011 through to Friday November 4, 2011. Xeneca must receive all comments in writing regarding the proposed project and/or the ER no later than November 4, 2011.
Last update - October 7, 2011