Serpent River Four Slide Falls GS
Serpent River - Four Slide Falls GS Environmental Assessment Report
* Please note that the review period for this Environmental Assessment Report is now closed
- A Letter to all Stakeholders
- Environmental Report
- Notice of Completion
- Annex I: Hydrology Studies & Proposed Operating Plan
Annex 1A: Hydrology Review for Serpent River Hydropower Site
Annex 1B: Headpond Inundation Mapping & Hydraulic Report
Annex 1C: Proposed Operating Flows & Levels
Annex 1D: Erosion Potential Assessment for Xeneca Power
Annex 1E: Four Slide Falls Hydrologic Analyses - Annex II: Conceptual Design
Annex IIA: Conceptual Layout Drawings
Annex IIB: Connection Line Summary
Annex IIC: Construction Management Plan - Annex III: Natural Environmental Characterization & Impact Assessment Report
- Annex IV: 2010 Surface Water Quality Letter Report
- Annex V: Stage 1 Summary Archaeological Assessment Report
- Annex VI: Description of Navigability
- Appendix A: Waterway Designation & MNR Site Description Package
- Appendix B: Potential Effects Identification Matrix for Construction & Operation
- Appendix C: Agency Consultation
- Appendix D: Public Consultation
Xeneca must respect the confidentiality of stakeholders. Xeneca is committed to fulfilling its consultation obligation. If you are looking for a specific document, we will take your request under consideration. We need to review any outgoing correspondence for confidentiality before it is released to the public. - Appendix E: Aboriginal Consultation & Engagement
Xeneca must respect the confidentiality of stakeholders. Xeneca is committed to fulfilling its consultation obligation. If you are looking for a specific document, we will take your request under consideration. We need to review any outgoing correspondence for confidentiality before it is released to the public.
*Please Note - The ER will be available on our website for a 30 calendar day review period from August 31, 2011 through to September 29, 2011. Xeneca must receive all comments in writing regarding the proposed project and/or the ER no later than September 29, 2011.
Last update - September 19, 2011