Ivanhoe River The Chute GS
Ivanhoe River - The Chute GS Environmental Assessment Report
- A Letter to All Stakeholders
- Environmental Report
- Notice of Completion
- Annex I - Hydrology Studies & Proposed Operating Plan
Annex I A - Hydrology Review
Annex I B - Proposed Operating Flow & Levels
Annex I C - Erosion Potential Assessment
Annex I D - Headpond Inundation Mapping Hydraulic Report
Annex I E - Hydrology Memo - Additional Hydrologic Analyses - Annex II - Conceptual Design
Annex II A - Conceptual Layout Drawings:
Plate 1 - Conceptual Site Layout
Plate 2 - Conceptual Spillway Dam Plan
Plate 3 - Conceptual Control Dam & Sections
Plate 4 - Conceptual Powerhouse Plan & Sections
Option 2 - Conceptual Site Layout
Option 2 - Conceptual Powerhouse Plan & Sections
Annex II B - Construction Managment Plan (CMP):
CMP Part 1 & 2
Drawing 1 - Cofferdams Sections & Detail
Drawing 2 - Construction Sequence Plan 1
Drawing 3 - Construction Sequence Plan 2 (Option 1)
Drawing 4 - Construction Sequence Plan 2 (Option 2) - Annex III - Natural Environmental Characterization & Impact Assessment Report
- Annex IV - 2010 Surface Water Quality Letter Report
- Annex V - Stage 1 Summary Archaeology Report
- Annex VI - Connection Lines Summary
Annex VI A - Lines & Roads Report
Annex VI B - Lines & Roads Map - Appendix A - Waterway Destination & MNR Site Information Package
- Appendix B - Effects Matrix
- Appendix C - Agency Consultation
- Appendix D - Public Consultation & Engagement
- Appendix E - Aboriginal Consultation & Engagement Plan
*Please Note - The ER will be available on our website for a 60 calendar day review period. This is an extension from the usual 30 calendar day review period as required in the Class EA process. This extended review period is meant to allow increased opportunity for all stakeholders to identify issues. Thus, this ER is being made available for review and comment from July 14, 2011 through to September 12, 2011. Xeneca must receive all comments in writing regarding the proposed Project and/or the ER no later than September 12, 2011. It is preferred that all comments be received during the first 30-calender days of the review period, if possible, and thus allow the stakeholder a significant period of engagement during the remainder of the review period to work with Xeneca toward a resolution of the issues.